Milestones

  • 1910 Foundation of the Jäckering Mill by Hermann Jäckering
  • 1945 Foundation of the Jäckering Mill by Günter Jäckering under the trade name “Mühlen- und Nährmittelwerke H.Jäckering Inh. Günter Jäckering”
  • 1955 Design & Development of the ULTRA-ROTOR
    A comminution machine which makes grinding of wheat & other products possible
  • 1958 Opening of the machine production with place of business in Altenburg/Hesse and Hamm under the trade name”Altenburger Maschinen Jäckering & Co”
  • 1959 Acquisition of “Gewerkschaft Rose”, an oxygen-work operated by hydro-power in Obersteeg/Cologne; Trade name: Firma Jäckering, Werk Obersteeg
  • 1960 Enhancements of the ULTRA-ROTOR for the starch and protein production
  • 1961 Foundation of the “Jäckering Gesellschaft für Grund- und Rohstoffverarbeitung” for processing of thermoplastics
  • 1965 Foundation of the „Altenburger Maschinenfabrik Jäckering GmbH“ with location in Hamm-Harbor
  • 1969 Construction of the Administration Building (Headquarters) in Hamm
  • 1976 Destruction of the mill and starch-production caused by fire
  • 1976/77 Rebuilding of the mill in Hamm-Harbor; Installation of the new modern mill
  • 1984 Introduction of the decanter-process; wastewater free starchproduction
  • 1985 Milling of 100,000 tons of wheat per annum; relocation of the “Altenburger Maschinen Jäckering GmbH” onto the Thyssen-Area/Hamm more than 3700 m² space for for production and testmilling
  • 1988 Death of Günter Jäckering; Entreprise take-over by Michael Andreae-Jäckering;
    Construction of the ULTRA-ROTOR-mill with a daily capacity of 300 tons of wheat
  • 1995 Installation of an electric utility on basis of gas motors with 5 MW electrical output, full use of the rejected air
  • 2000 Flour input for starch production: first time 100,000 tons
  • 2001 Flour input more than 150,000 tons per annum
  • 2004 Foundation of the “Jäckering Processing GmbH”; grinding, mixing and packaging of products for non-food industries in Obersteeg/Cologne
  • 2009 Installation of a cogeneration unit on basis of gas motors with 10.24 MW output / Start-up 2010
  • 2011 Installation of an evaporation plant
  • 2012 Start-up of evaporation plant
  • 2013/13 Construction and commissioning of 6 storage silos for wheat
  • 2012/13 Modernisation of the combined heat and power plant with a power increase
  • 2013 Implementation of an energy management system according to ISO 50001
  • 2014 Commissioning of the fully automatic bagging sack system
  • 2014 Construction and commissioning of the combined heat and power plant for Jäckering Grund und Rohstoffverarbeitung GmbH & Co.KG with an electrical performance capacity of 840 kW
  • 2014 Renovation and ecological improvement of the hydroelectric power plant at the Felsberg site
  • 2015 Foundation of the company Jäckering Research GmbH
  • 2016 Grinding of 300,000t of grain per annum
  • 2016 Completion of the new testing plant
  • 2016 Expansion of the existing evaporation plant, construction and commissioning